From transformers and switchgear to ring main units, substations, circuit breakers and smart components, Jubang provides integrated product support for power distribution projects.

Discover Jubang’s strengths in technology R&D, quality testing and smart manufacturing, supporting reliable electrical equipment and efficient power distribution solutions for global customers.

From technical consultation and OEM/ODM customization to EPC support, smart O&M, delivery documentation and after-sales service, Jubang supports your project at every stage.

Explore Jubang Group’s development history, intelligent manufacturing base, R&D platforms, CNAS-accredited laboratory and global project service capabilities.

A renewable booster substation cable-gland schedule should link every cable reference to an entry point, equipment boundary, drawing revision, source document, open action, and responsible owner before enclosure fabrication. It creates a controlled review record; it does not select a gland, confirm a size, state an ingress rating, or approve installation.

Start with the enclosure and equipment boundary. A renewable booster substation can contain transformer, MV, auxiliary, control and external package interfaces, so the schedule should state what is in scope and which controlled document establishes it. A product image or generic enclosure description is not a cable-entry decision.
Important: A cable-gland schedule must make its source drawings and unresolved interfaces visible before fabrication. It is not a substitute for the approved project design. (IEC 62271-202)
Each row should point to a named cable or circuit reference and the applicable drawing revision. This lets the EPC identify whether a late change affects the enclosure entry, another package, or the document index.
| Schedule field | Record to request | Do not claim |
|---|---|---|
| Cable reference | Approved cable or circuit tag | A final cable selection |
| Drawing reference | Drawing number, revision and owner | Approved fabrication detail |
| Equipment boundary | Package or enclosure scope | A complete installation design |
| Source document | Controlled project record | A universal default |
Record the intended entry point reference, the enclosure side or compartment, and the package owner. The field should reference a controlled drawing rather than a verbal direction. When an interface remains open, leave it as an action instead of inventing a location.

| Interface item | Input for the schedule | Responsibility |
|---|---|---|
| Entry point | Drawing reference and revision | EPC / design authority |
| Enclosure boundary | Compartment or package reference | Scope owner |
| External package | Interface matrix reference | EPC / package owner |
| Unresolved item | Action number and decision path | Project manager |
For related routing context, see JUBANG’s prefabricated substation layout and cable routing article. It does not select a gland or establish an enclosure result.
The schedule needs a document controller, a design authority for the entry reference, and named owners for package interfaces. Record who proposes a change, who reviews it, and who issues the next controlled revision. Do not treat an email comment as a replacement for a revised project record.
Ask the project team to name:
Use a unique action reference for missing cable data, unconfirmed entry points, scope conflicts, or pending drawing changes. Show the factual gap, responsible party, required input, and required revision. A schedule with blank cells should not be interpreted as a confirmed design.
| Open-action field | Minimum record |
|---|---|
| Action reference | Unique project number |
| Affected row | Cable or entry reference |
| Missing evidence | Drawing, scope or interface record |
| Owner | Named responsible party |
| Closure route | Controlled revision or approval record |
Send the schedule with one controlled revision register. Ask suppliers to identify information gaps and deviations rather than apply undocumented assumptions.
| RFQ input | Buyer should provide | Why it is needed |
|---|---|---|
| Scope basis | One-line diagram and enclosure scope matrix | Defines the record boundary |
| Cable identity | Cable/circuit tags and source drawings | Makes rows traceable |
| Entry references | Controlled entry-point or layout drawings | Locates the interface |
| Package matrix | External package and ownership references | Separates responsibilities |
| Open actions | Action register and decision authority | Keeps assumptions visible |
| Document control | Revision register and required response format | Controls handover |
For wider project inputs, see JUBANG’s PV booster station design inputs. That page is not a cable-gland selection method.
After the cable-gland schedule, interface matrix, and open actions are controlled, the EPC can discuss the equipment scope with the JUBANG prefabricated substation range.

The product-family page does not prove a gland type, cable compatibility, sealing performance, enclosure classification, or project acceptance. Submit the controlled records through JUBANG Contact Us so the project team can request a scope review.
Record the cable or circuit reference, entry-point drawing reference, equipment boundary, document revision, open action, and responsible owner.
The EPC should name a document owner and collect controlled inputs from the design authority and relevant equipment-package owners.
No. The schedule is a controlled input record; a project-approved design must determine any selection or size.
Revise the controlled schedule when a cable reference, entry point, enclosure boundary, drawing, package interface, or open-action decision changes.
No. It records the project source for the relevant requirement and does not make a classification conclusion.
Send the scope basis, cable identities, entry drawings, package matrix, action register, revision index, and required response format.