From transformers and switchgear to ring main units, substations, circuit breakers and smart components, Jubang provides integrated product support for power distribution projects.

Discover Jubang’s strengths in technology R&D, quality testing and smart manufacturing, supporting reliable electrical equipment and efficient power distribution solutions for global customers.

From technical consultation and OEM/ODM customization to EPC support, smart O&M, delivery documentation and after-sales service, Jubang supports your project at every stage.

Explore Jubang Group’s development history, intelligent manufacturing base, R&D platforms, CNAS-accredited laboratory and global project service capabilities.

An EPC should request a controlled booster-substation spare-parts pack that links each item to an equipment tag, part or assembly reference, drawing revision, quantity basis, storage record, and named responsibility. The pack makes the request traceable; it does not promise stock, compatibility, shelf life, or maintenance results.

“Spare part” may mean a commissioning item, a maintenance spare, a recommended spare, or a site consumable. Name the category, equipment boundary, and contract package before asking for a list. A product photograph cannot prove inclusion, availability, or interchangeability.
Important: Treat a spare-parts list as a controlled project record. It should state its equipment scope, revision, quantity basis, and responsible owner; it is not a promise of inventory or replacement fit. (IEC 60076-1)
Each line should let the EPC connect the item to the installed equipment and current design record. Use the same tags and references as the approved drawings where possible.
| Traceability field | What to request | Why it matters |
|---|---|---|
| Equipment tag | Installed tag or asset context | Avoids ambiguous descriptions |
| Item identity | Part, assembly or manufacturer reference | Supports document matching |
| Drawing reference | Drawing number and revision | Controls configuration context |
| Quantity basis | Project case and rationale | Shows how quantity was set |
Ask the supplier to label whether an item is a commissioning spare, maintenance spare, recommended spare, or consumable. The category should be accompanied by a quantity basis and the party that approved it.

| Category | Document input | Do not claim |
|---|---|---|
| Commissioning spare | Project commissioning scope and owner | Guaranteed need |
| Maintenance spare | Maintenance philosophy or owner instruction | Service-life result |
| Recommended spare | Supplier rationale and project review status | Universal recommendation |
| Consumable | Handling/storage note and responsible party | Shelf-life guarantee |
For a related accessory topic, see JUBANG’s transformer remote condition monitoring accessories. It does not establish a spare list or availability.
The handover pack should identify the drawing, datasheet, manual, storage/handling sheet, packing list, and any inspection record that belongs with the spare. Keep superseded revisions visible in the history but mark the current issue clearly.
JUBANG’s prefabricated substation export document handover is a related document-control reference; it does not guarantee a particular spare-parts package.
Record who defines the item, who prices or supplies it, who receives and stores it, and who accepts the handover. EPC, owner, supplier, and operations responsibilities should appear in the matrix rather than being inferred from a quotation.
The matrix should identify:
Send the list request with a controlled project basis. Ask for gaps, substitutions, and document dependencies to be flagged explicitly.
| RFQ input | Buyer should provide | Why it is needed |
|---|---|---|
| Equipment basis | One-line diagram, equipment list and tag register | Defines the installed scope |
| Identity basis | Nameplates, assembly references and current drawings | Makes each line traceable |
| Category basis | Commissioning/maintenance philosophy | Explains the list category |
| Quantity basis | Project case, redundancy or owner instruction | Avoids hidden assumptions |
| Storage basis | Site storage conditions and receiving owner | Assigns handling responsibility |
| Document handover | Datasheets, manuals, packing list and revision index | Supports controlled receipt |
After the list, responsibility matrix, and document index are approved, the EPC can discuss the project with the JUBANG prefabricated substation range.

The public product page does not prove stock, shelf life, compatibility, lead time, or maintenance outcome. Send the controlled scope through JUBANG Contact Us for project-specific review.
Include the equipment tag, item or assembly reference, drawing revision, category, quantity basis, storage record, and responsible owner.
Use the installed equipment tag together with a part or assembly reference and the current drawing or datasheet revision.
The contract and responsibility matrix should name the supplier or package owner; do not infer scope from a generic quotation.
Use a controlled list, packing or receipt record, storage/handling information, and a document index with current revisions.
Keep categories distinct and record the basis and approving party for each so the owner can review the intent.
No. Availability, compatibility, lead time, and service-life questions require project-specific confirmation and controlled records.