From transformers and switchgear to ring main units, substations, circuit breakers and smart components, Jubang provides integrated product support for power distribution projects.

Discover Jubang’s strengths in technology R&D, quality testing and smart manufacturing, supporting reliable electrical equipment and efficient power distribution solutions for global customers.

From technical consultation and OEM/ODM customization to EPC support, smart O&M, delivery documentation and after-sales service, Jubang supports your project at every stage.

Explore Jubang Group’s development history, intelligent manufacturing base, R&D platforms, CNAS-accredited laboratory and global project service capabilities.

Before handover, an EPC should align every booster-substation equipment tag with its description, scope boundary, physical-label reference, controlled drawings, document-index revision, discrepancy action, and responsible owner. The register supports a traceable handoff; it does not certify as-built status or configure any data system.

An equipment tag can refer to a transformer, switchgear panel, relay, breaker, enclosure item, or package interface. Start by recording which equipment packages the register covers and which document controls the boundary. A label seen in a photograph is not evidence that a tag register is complete.
Important: Treat the tag register as a controlled alignment record. The project authority must decide whether any issue becomes an as-built record or acceptance evidence. (IEC 62271-202)
Every row should provide enough evidence to connect a tag to the named equipment and current document set. Keep the identity fields factual and point back to controlled project records.
| Identity field | Record to align | Do not claim |
|---|---|---|
| Equipment tag | Project tag or asset identifier | Final asset-system integration |
| Description | Equipment and package description | A verified configuration |
| Scope reference | Matrix or package boundary | Contract acceptance |
| Document reference | Drawing or index number and revision | As-built certification |
Compare the physical-label record, drawing references, and document index against the current scope matrix. Where a record differs, log the discrepancy; do not overwrite one source with another without controlled project approval.

| Alignment item | Evidence to review | Owner |
|---|---|---|
| Physical label | Inspection or receiving record | Equipment-package owner |
| Drawing reference | Controlled schematic or GA revision | Design authority |
| Document index | Current issue and revision | Document controller |
| Scope matrix | Package-interface reference | EPC |
For related handover context, see JUBANG’s PV booster station site record handover article. It does not validate a tag or certify an as-built record.
Name who prepares the register, who controls drawings, who supplies label evidence, who reviews discrepancies, and who approves a controlled update. This prevents a supplier comment, an EPC note, or an operations request from silently changing the register.
The responsibility list should identify:
Give each mismatch a unique reference and state the tag, document, factual difference, owner, required evidence, and closure route. Keep an open action distinct from a corrected revision. A revised register does not by itself establish physical verification or acceptance.
| Discrepancy field | Minimum record |
|---|---|
| Action reference | Unique tracking number |
| Affected tag | Equipment or package identifier |
| Evidence | Label, drawing or index reference |
| Owner | Named responsible party |
| Closure route | Controlled revision or approval record |
For revision-control context, see JUBANG’s prefabricated substation drawing revision control article. It does not replace the project register.
Issue the register with one controlled revision index and ask recipients to identify missing evidence and discrepancies explicitly.
| Handover/RFQ input | Buyer should provide | Why it is needed |
|---|---|---|
| Equipment basis | Scope matrix, equipment list and one-line diagram | Defines register coverage |
| Identity fields | Project tag and equipment descriptions | Makes rows traceable |
| Controlled documents | Current drawings, schematics and index | Aligns revisions |
| Label evidence | Inspection or receiving-record reference | Supports comparison |
| Action log | Open discrepancies and decision owner | Keeps gaps visible |
| Revision control | Issue register and required response format | Controls handover |
After the tag register, scope matrix, and action log are controlled, the EPC can discuss the equipment scope with the JUBANG prefabricated substation range.

The product-family page does not validate labels, tags, as-built status, integrations, or project acceptance. For an equipment-specific discussion, provide the controlled tag package using JUBANG Contact Us.
Include the equipment tag, description, scope boundary, label reference, controlled document reference, revision, discrepancy action, and owner.
The project document-control plan should name the register owner, the reviewers, and the approval route for controlled revisions.
Yes. Compare it with the current controlled drawings and log any mismatch as an assigned project action.
Not automatically. It is an alignment record unless the responsible project authority formally designates and approves it as an as-built record.
Use a unique action reference with the affected tag, factual evidence, responsible owner, required record, and controlled closure route.
Send the scope matrix, equipment list, controlled drawings, document index, label evidence references, action log, and revision register.