From transformers and switchgear to ring main units, substations, circuit breakers and smart components, Jubang provides integrated product support for power distribution projects.

Discover Jubang’s strengths in technology R&D, quality testing and smart manufacturing, supporting reliable electrical equipment and efficient power distribution solutions for global customers.

From technical consultation and OEM/ODM customization to EPC support, smart O&M, delivery documentation and after-sales service, Jubang supports your project at every stage.

Explore Jubang Group’s development history, intelligent manufacturing base, R&D platforms, CNAS-accredited laboratory and global project service capabilities.

A PV booster station equipment review starts more reliably with controlled site records than with a product name alone. The owner and EPC should identify the source, revision, and decision owner for available photos, drawings, access notes, interfaces, and open assumptions before asking a supplier to comment.
This guide organizes existing evidence for a project enquiry. It does not perform a site survey, select a transformer, create an electrical study, define a layout, or approve an installation.

Start by stating what the package is for: an initial enquiry, a clarification meeting, or a quotation comparison. Label each item as observed site evidence, a controlled project document, supplier material, or an unresolved assumption. This avoids presenting a photo or an early sketch as proof of a site condition.
IEC 62271-202 is scope context for AC prefabricated substations, while IEC 60076-1 is transformer standards-family context. Neither source approves a PV site or selects equipment for it.
Important: A site photo can document what was observed, but it does not confirm an electrical interface, access design, equipment fit, or approval. Record its source, date, location reference, and owner. (IEC 62271-202)
Use a simple record index. Photos should have a source and date; drawings should have a title, revision, issuing party, and status. If an item cannot be traced, mark it as reference-only and assign a party to provide the controlled source.
| Record type | Information to record | Typical owner |
|---|---|---|
| Site photos | Date, source, location reference, purpose | Owner / EPC |
| One-line diagram | Title, revision, issuer, status | EPC / design authority |
| Civil record | Drawing reference, interface owner, open items | EPC / civil designer |
| Supplier document | Model reference, issue date, response owner | Supplier |
The index is not a survey report. It lets all parties identify which information may be used for a specific review.
Access and civil information should be recorded as project evidence rather than converted into generic design advice. Note the relevant source document, the condition being reviewed, and the party who can confirm or update it.

| Record topic | What to identify | Do not infer |
|---|---|---|
| Site access | Source record and responsible confirmer | A delivery or lifting method |
| Civil interface | Current drawing and coordination owner | A foundation design |
| Available space | Approved record and limitation owner | A layout solution |
| Existing services | Project document and interface owner | A connection arrangement |
For civil and earthing handover responsibilities, see JUBANG’s prefabricated substation site-delivery article. This article is limited to record control before an equipment discussion.
An equipment enquiry needs the current source for the interface information, but it should not reinterpret that source without the project authority. Record the one-line diagram revision, the inverter or collection-system document reference if available, and the party responsible for confirming each item.
| Interface record | Request | Why it matters |
|---|---|---|
| Project one-line | Current revision and issuing party | Identifies the review boundary |
| Inverter reference | Approved supplier or EPC document | Names the source, not a selection result |
| MV collection record | Current project reference and owner | Shows the external interface |
| Open assumption | Description, owner, due route | Prevents an undocumented default |
For a wider electrical-input package, use the related PV booster station design-inputs article. That resource does not replace the controlled record index for this enquiry.
Missing information should be visible, not silently completed by a bidder. Create an assumptions log with the item, its known source, the party expected to confirm it, and the path for acceptance or replacement.
This protects the RFQ from false certainty without deciding the final technical solution.
Issue a controlled package and invite bidders to identify evidence gaps or deviations. The RFQ should request comments against the named records, not a generic promise of site suitability.
| RFQ input | Buyer should provide | Why it is needed |
|---|---|---|
| Record index | Source, revision, status and owner for each item | Establishes the evidence boundary |
| Site photos | Traceable observation records and purpose | Gives context without claiming approval |
| Drawings and interfaces | Current project references and coordinators | Identifies responsibility |
| Access and civil notes | Available project records and confirmer | Preserves external dependencies |
| Assumptions log | Open item, owner and acceptance route | Prevents silent defaults |
| Commercial scope | Requested documents, exclusions and quote revision | Separates offer scope from engineering approval |
The responsible project engineer must confirm the actual design, site conditions, and applicable requirements.
When the record package is controlled, the team can review the JUBANG prefabricated substation range for a project discussion.

The product-family page cannot confirm a survey, electrical interface, access arrangement, equipment fit, compliance, or project approval. Use JUBANG Contact Us to share the record index and clarify the evidence available for the enquiry.
No. It organizes existing site evidence and responsibility before an equipment enquiry; it does not create the electrical or civil design.
Every project drawing and supplier document used for the review should show a title, revision, issuing party, date, and status.
The project should name the responsible owner, EPC, civil designer, or other authority for each record. A supplier comment does not automatically confirm the condition.
No. A photo records an observation. Use the current controlled project document and its owner for electrical-interface confirmation.
Place it in an assumptions log with its known source, confirmation owner, next action, and acceptance route.
Send the record index, traceable photos, current drawings and interfaces, access notes, assumptions log, requested documents, and commercial scope.
No. A product page introduces a range; project records, studies, approvals, and the responsible engineering review determine site fit.