From transformers and switchgear to ring main units, substations, circuit breakers and smart components, Jubang provides integrated product support for power distribution projects.

Discover Jubang’s strengths in technology R&D, quality testing and smart manufacturing, supporting reliable electrical equipment and efficient power distribution solutions for global customers.

From technical consultation and OEM/ODM customization to EPC support, smart O&M, delivery documentation and after-sales service, Jubang supports your project at every stage.

Explore Jubang Group’s development history, intelligent manufacturing base, R&D platforms, CNAS-accredited laboratory and global project service capabilities.

Prefabricated substation foundation and earthing handover should turn site assumptions into a controlled project record before delivery is finalized. The EPC team needs agreed responsibility for civil interfaces, cable entries, earthing coordination, drawings, and acceptance boundaries; a product image cannot replace that project package.

Important: Do not treat a generic product layout as a foundation or earthing design. The responsible project parties must approve the civil, electrical, safety, and acceptance inputs for the actual site. Source: IEC 62271-202, used here only as a scope reference.
The handover determines whether the equipment, site preparation, and project documents are being reviewed on the same basis. It identifies which interfaces have been approved, which party owns the remaining decisions, and which documents are needed before dispatch and site receiving.
IEC 62271-202 can provide a scope reference for prefabricated substation discussions. It does not determine a civil design for a particular installation.
The owner, EPC contractor, civil designer, electrical designer, earthing designer, equipment supplier, and site team can each have defined inputs. A usable handover record names who supplies, checks, approves, and releases each project document.
That record prevents a delivery request from being mistaken for approval of work outside the supplier’s documented scope.
The project package should identify the approved equipment location, applicable drawing references, cable approach, access and lifting interface, site datum, and any foundation information issued by the responsible civil team. The actual details must come from controlled documents, not from a generic article.

The related prefabricated-substation layout article helps structure access and cable-routing questions. It does not supply a site foundation solution.
Earthing must be coordinated with the approved electrical design, fault and safety assessment, site conditions, and local requirements. The handover should state the assigned design responsibility and the information the equipment supplier needs to receive or return.
No universal earthing value or arrangement belongs in this article. The responsible engineer must verify the project-specific approach.
Cable routes, entry locations, delivery access, lifting arrangements, and the site sequence should be coordinated before dispatch. A late change can affect more than the civil works because it can alter the documents, receiving plan, and interfaces held by several parties.
Use the prefabricated-substation transport planning article to organize logistics questions with actual drawings and delivery records. It does not establish transport limits for another unit.
Issue one controlled set of inputs before finalizing the delivery plan.
| Buyer should provide or request | Why it matters to the handover |
|---|---|
| Approved one-line diagram and interface drawing | Connects equipment scope with the project electrical arrangement |
| Site location and civil drawing references | Shows the documents that govern site preparation |
| Cable approach and entry coordination | Lets each party review an agreed interface rather than an assumption |
| Earthing responsibility and review path | Keeps the safety-critical design decision owned by the project |
| Access, lifting, and delivery-sequence inputs | Aligns site receiving with actual logistics planning |
| Required approvals, records, and acceptance boundary | States what must be complete before handover is released |
JUBANG’s prefabricated substation range is the starting point for an equipment discussion when the project team can share its controlled interface package. It should not be used as evidence that a particular foundation or earthing arrangement has been approved.

Send the drawing references, responsibility map, cable interface, delivery conditions, and document list through the JUBANG contact channel. The responsible project engineer should confirm site readiness before final release.
It is a controlled project record that assigns civil, cable-entry, earthing, document, and acceptance interfaces before equipment delivery is finalized.
No. A product image can show equipment context, while the responsible civil team must issue and approve the site-specific documents.
The approved project responsibility map must identify the party that designs, reviews, and approves the earthing approach. A general equipment article cannot assign that responsibility.
Cable routes and entry interfaces can affect site preparation, documents, equipment coordination, and the receiving sequence. They need agreement before dispatch planning is fixed.
Include approved drawings, site references, cable interfaces, the earthing responsibility path, access and delivery conditions, and the required approval and acceptance records.
No. A web enquiry can start an equipment discussion, while the responsible project parties must approve the civil and earthing design for the actual site.