From transformers and switchgear to ring main units, substations, circuit breakers and smart components, Jubang provides integrated product support for power distribution projects.

Discover Jubang’s strengths in technology R&D, quality testing and smart manufacturing, supporting reliable electrical equipment and efficient power distribution solutions for global customers.

From technical consultation and OEM/ODM customization to EPC support, smart O&M, delivery documentation and after-sales service, Jubang supports your project at every stage.

Explore Jubang Group’s development history, intelligent manufacturing base, R&D platforms, CNAS-accredited laboratory and global project service capabilities.

Feeder automation architecture assigns protection, sensing, and communications roles across reclosers, FTUs, and the control system; buyers should lock those role boundaries and data interfaces before comparing device quotations. Use this page to separate recloser, FTU, and SCADA roles before device shopping.

It is the role map for sensing, protection decisions, switching, and SCADA visibility along a feeder. Devices implement roles; they do not invent the map.
Readers searching for feeder automation architecture usually need a project checklist, not a catalog slogan.
A recloser typically interrupts fault current under its protection logic. A sectionalizer usually isolates after counting operations coordinated with upstream protection. Confirm project definitions before buying.
| Role | Typical owner | RFQ question |
|---|---|---|
| Fault interruption | Recloser / breaker function | Who owns the curve file? |
| Sectionalizing logic | Project protection design | Count method documented? |
| Telemetry concentration | FTU / RTU as designed | Point list attached? |
| SCADA visibility | Control system team | Protocol boundary stated? |
An FTU often concentrates measurements, status, and telecontrol for a field unit. It does not automatically own protection settings unless the architecture assigns that role.
Important: Do not treat feeder automation architecture as a shopping list of reclosers and FTUs without a role map and protection ownership statement. (Source: IEC telecontrol / IEEE distribution protection resources / project architecture notes.)
No. Protection settings belong to the protection study and approved setting files. An FTU may transport or host functions only as designed.

List points, protocols, time sync expectations, and cybersecurity boundaries at a requirements level without inventing setpoint values here.
Attach the role map, device list, interface list, and document expectations, then discuss JUBANG switching device routes that fit the architecture.
| RFQ field | Purpose | Owner |
|---|---|---|
| Role map | Stops device-only buying | Automation / protection |
| Interface list | Defines integration scope | SCADA / telecom |
| Device schedule | Locks hardware discussion | Project design |
| Document pack | Defines deliverables | Buyer / supplier |

Related articles:
– pole-mounted recloser checklist
– primary-secondary fusion breaker checks
– RMU expansion planning
Keep the role map with the JUBANG medium-voltage pole-mounted circuit breaker range inquiry, or contact JUBANG when device boundaries are still open.
Why not: Do not treat an FTU quotation as a substitute for a recloser protection study.
This article explains architecture vocabulary. It does not design protection, certify protocols, or approve a SCADA configuration.
Describe it as the assignment of sensing, protection, switching, and communications roles along a feeder.
A recloser typically interrupts faults; a sectionalizer usually isolates after coordinated counts. Confirm project definitions.
An FTU often concentrates field measurements and telecontrol; protection ownership must be stated separately.
No. Settings come from the approved protection study.
Points, protocols, time sync expectations, and security boundaries at requirements level.
Role map, device schedule, interfaces, documents, and destination.
Design approval belongs to the project authority, not this article.