An EPC should request a controlled RMU cable-interface record linking each cable and feeder tag to the compartment, entry drawing, termination reference, document revision, open action and responsible package owner. It makes the handoff traceable; it does not select a termination or prove cable compatibility.

JUBANG fixed ring main switchgear for cable-compartment interface records

Part 1. Define the cable-compartment interface boundary

Start by naming the RMU panel, cable compartment, feeder scope and adjacent package. A cable interface can involve the RMU supplier, cable supplier, EPC and site team; the record should show which party owns each input. A product image is not evidence of cable compatibility or a termination arrangement.

Important: Keep the cable-interface record tied to controlled drawings and the current scope matrix. Do not turn a catalogue image into an installation or acceptance conclusion. (IEC 62271-202)

Part 2. Align cable and feeder identity

Every row should connect a cable or feeder tag to the RMU panel and compartment. Record the source document and revision so later changes can be traced.

Identity field Record to align Do not claim
Feeder tag Approved circuit or feeder identifier Final cable selection
RMU panel Panel or functional-unit tag Complete configuration
Compartment Cable-compartment reference A termination result
Source record Drawing or schedule revision As-built approval

The interface record should link the GA or compartment drawing, cable schedule, termination document and any screen or earth reference that the project requires. If references conflict, log the conflict rather than choosing a preferred drawing informally.

JUBANG outdoor cable branch cabinet for interface-record mapping
Evidence item Input to request Owner
Compartment drawing Current GA or panel drawing RMU supplier
Cable schedule Feeder tag and source revision EPC
Termination record Controlled termination reference Cable/package owner
Screen/earth record Project requirement and owner Design authority

For broader RFQ context, see ring main unit cable connection RFQ data. That article does not decide a termination or prove compatibility.

Part 4. Assign package and approval responsibility

Name who controls the RMU drawing, who provides cable data, who reviews the termination record, who resolves the interface and who approves a change. A quotation should not silently transfer design responsibility.

The responsibility matrix should identify:

  1. the RMU supplier drawing owner;
  2. the EPC cable-schedule owner;
  3. the cable or termination package owner;
  4. the technical reviewer for discrepancies; and
  5. the authority for controlled closure.

Part 5. Track open interface actions

Give each missing cable datum, drawing conflict or compartment question a unique action reference. Record the affected feeder, evidence gap, owner, due date and closure record. Keep an unresolved action distinct from an approved revision.

Action field Minimum record
Reference Unique project action number
Affected feeder Cable or panel tag
Evidence gap Drawing, schedule or termination record
Owner Named package or design owner
Closure Revised record or approval note

For network-planning context, see RMU expansion planning. It is not a cable-interface approval method.

Part 6. Build the RMU cable-interface RFQ pack

Send the interface record with one controlled revision register and ask suppliers to flag missing data or deviations explicitly.

RFQ input Buyer should provide Why it is needed
Scope basis One-line diagram, panel list and interface matrix Defines the boundary
Feeder identity Cable tags and source schedule Makes rows traceable
Compartment evidence Current GA and entry drawings Locates the interface
Termination basis Controlled termination or cable documents Shows the evidence source
Ownership Package matrix and approval path Separates responsibilities
Action control Open-item log and revision rules Prevents silent assumptions

Part 7. Use the controlled record for a product enquiry

After the cable-interface record, scope matrix and open actions are controlled, the EPC can discuss the equipment scope with the JUBANG switchgear and ring main unit range.

JUBANG indoor vacuum breaker product context for a cable-interface enquiry

The product-family page does not prove cable fit, termination performance, compartment suitability, certification or project acceptance. Submit the controlled interface package through JUBANG Contact Us for project-specific review.

FAQs

What should an RMU cable interface record include?

Include the cable and feeder tags, RMU panel, compartment reference, entry drawing, termination document, revision, open action and owner.

Who owns the cable-compartment interface?

The project scope matrix should name the RMU package owner, cable or termination owner, EPC reviewer and approval authority.

What drawings are needed for RMU cable connections?

Request the current GA or compartment drawing, cable schedule, interface matrix and applicable termination document with revisions.

Can an RMU photo prove cable compatibility?

No. Compatibility requires approved project data and a responsible design review; a photo only supplies product context.

How should a cable-interface discrepancy be closed?

Assign a unique action, record objective evidence and owner, then close it through a controlled revision or approved disposition.

What should an EPC send with an RMU cable-interface RFQ?

Send the scope basis, feeder tags, compartment drawings, termination references, ownership matrix, open actions and revision register.